Education & Training

  • Licensed General Contractor, Sate of California 1986
  • 1980 – 1981, Polytechnic of Central London, London, England (UK)
    • Masters Degree in Construction Management
  • 1974 – 1980, Ewell College of Technology, Surrey, England (UK)
    • Bachelor’s Degree – Construction Management

Work Experience / Accomplishments

2001 – Current, Bp-Pak, Inc. (formerly Bp-Pak Development and Design), Santa Clara, CA – Company President

  • Manage all projects from bidding phase to contract closeout
    • Residential
    • Commercial
    • Public Works
  • Oversee all field labor and personnel staff
  • Past Projects include, but are not limited to
    • Cyberlink Offices, San Jose, CA
    • Fire Station # 13 Apparatus Bay Modifications
    • Whispering Winds, Fitness Center,
    • Santa Clara Valley Center for the Blind, Office Renovation,
    • Alum Rock Unified School District (Various Projects, 12 different Schools)
    • Campbell Unified School District (Various Projects, six different schools)
    • Fremont Unified School District (Various Projects)
    • San Jose Unified High School (Various Projects)
    • Franklin McKinley School District (2 Chair Dental Office in District Office)
    • City of San Jose (Various Projects)
    • County of Santa Clara (Various Projects)

 

1991 – 2001, Vanir Construction Management, Los Angeles, CA – Project Manager

  • Managed City of Santa Clara Police Facility Project in Santa Clara, CA
    • Construction of new facility
    • Seismic Activity rating of 10 – Public Building Safety Act
  • Managed Santa Clara County Juvenile Center Projects in San Jose, CA
    • Remodeling of existing facility
    • Construction of new 180 room juvenile housing center
  • Managed Hyperion Digester Modifications Project
    • Replacement of gas mixing compressors
    • Improvement of drainage system
    • Provide foam abatement system
    • Replacement/Upgrade of ferrous chloride facility at new location
    • Provide on-site and/or phone support 24×7
    • Install and integrate software in production server environment
  • Managed Theo Lacy Jail Expansion Project
    • Extension to existing jail facility
    • Five (5) separate buildings involved
  • Managed Juvenile Justice Center Project
    • Construction of three (3) buildings in excess of 350K sq.ft.
    • One (1) building being a seven (7) story courts building
  • Both projects required field coordination, punch list preparation & contract close out

 

1986 – 1991, ACI Group, Inc., Los Angeles, CA – Corporate Secretary & Project Manager

  • Prepared contract documents for bidding process
  • Managed construction phase of various developments in Los Angeles area including:
  • 102-Unit apartment complex
  • 16-Unit condominium complex
  • 8-Unit luxury apartment complex
  • Over 95% of projects were completed ahead of schedule & under budget yielding net profit over 7%

 

1984 – 1996, Robert E. McKee, Inc., Los Angeles, CA – Project Engineer

  • Managed Hewlett Packard Regional Sales Office Project in Long Beach, CA
  • Over 72K sq.ft. per structural steel buildings incl:
    • Office Space
    • Mechanical Shop
    • Car Wash
    • Two (2) Gasoline Pumps
  • Project successfully completed ahead of schedule yielding net profit over 6%

 

1981 – 1984, C.L. Construction, Inc., Los Angeles, CA – Field Engineer

  • Directed Ritz Carlton Hotel Project in Laguna Nigel, CA
  • Directed Los Angeles International Airport Project in Los Angeles, CA